top of page
Bull float
In stock
Product Details
Minimum €22.5.00
Per Day €30.00
Additional Day €15.0
Week €90.00 Darbying or bull floating should be done immediately after "screeding", or after the concrete has been tamped if tamping was done.This process should be finished before excess moisture or bleedwater appear on the surface.
The purpose of darbying or bull floating concrete is to level ridges and fill voids left by the screeding operation. It should also slightly embed the coarse aggregate to make subsequent finishing operations easier.
Be careful when using these tools not to close up or seal the surface of the concrete, which may cause blistering or scaling.
Use a bull float for areas too large to reach with a darby, though it may produce a wavier surface.
Bull float
Display prices in:
EUR
bottom of page